SHAPE was engaged by Aurecon to deliver the Australian Defence Force Academy Chemistry Lab Refurbishment.
ADFA - Defence Chemistry Laboratory

Client: Department of Defence
Client Project Manager: Aurecon
Delivery Model: Lump Sum
Location: Canberra, ACT
Duration: 48 Weeks
Project Size: 2,300m2

The objective of the refurbishment was to transform the 40-year-old labs into new vibrant work areas for both Graduate and Undergraduate students.

Works consisted of the refurbishment of six labs, multiple specialised storage rooms, specialised distillation areas and preparation rooms. Services works took place over five levels, with the main fit out works being carried out across two levels.

The services works were the most complex part of the fitout, as the labs called for a specialised fume extraction system, high purity laboratory gases, specialised chemical resistant electrical fittings, fire suppression systems, emergency hydraulic wash points & fire protection.

The remainder of the building was still in occupation by ADFA throughout the whole construction process, meaning formal disruptions were kept to a minimum. Refurbishing a 40-year-old building brought some complexities in bringing items up to current codes & standards. However, SHAPE & Aurecon were able to successfully overcome any issues that had arisen.

Related Projects

Undisclosed Government Agency, Office Fitout

undisclosed-government-agency-fitout-canberra-act-shape-australia_2
Undisclosed Government Agency
ACT
Fitout & Refurbishment

4 National Circuit, Façade Replacement

ISPT
ACT
Facade Restoration

MinterEllison Canberra Office Fitout

Minter Ellison
ACT
Fitout & Refurbishment

National Capital Private Hospital Operating Theatres

Healthscope Operations
ACT
Fitout & Refurbishment

Burgtec Furniture Showroom Fitout

Burgtec Furniture
ACT
Fitout & Refurbishment

121 Marcus Clarke St Canberra End of Trip Facilities Upgrade

Colliers International
ACT
Fitout & Refurbishment

Canberra Hospital Building 8 Expansion

canberra-hospital-expansion-project-building-8-modular-act-canberra-shape-australia
Major Projects Canberra & ACT Government
ACT
New Build

Calvary Hospital Emergency Department Expansion

Calvary Healthcare
ACT
New Build

KPMG Canberra Office Fitout

KPMG
ACT
Fitout & Refurbishment

Canberra Hospital Paediatric High Care Ward Refurbishment

Major Projects Canberra
ACT
Fitout & Refurbishment