Clyde & Co Perth Office Fitout

SHAPE delivers an office relocation and comprehensive full-floor fitout for Clyde & Co at Level 50, Central Park in Perth.
clyde-&-co-perth-office-fitout-shape-australia_12

Client: Clyde & Co
Client Project Manager: Facilitate Corporation 
Delivery Model: Construction Management
Location: Perth, WA
Duration: 9 Weeks
Project Size: 950m2

The modern transformation of Clyde & Co’s new home.

Clyde & Co required a relocation and comprehensive fitout from their current space at 191 St Georges Terrace to Level 50, Central Park, situated in the heart of Perth’s CBD.

The project scope included creating high-end finishes and a reception area, ensuring a high level of acoustic integrity in meeting rooms, open area workstations, setting up critical communications room infrastructure, and integrating AV systems for client-facing meeting rooms. Additionally, the fitout needed to seamlessly integrate with the recent base build makegood, necessitating a careful balance between base build and fitout mechanical systems.

Notable innovations included the use of a rubber substrate under timber floors for acoustic enhancement and the deployment of a seconded team.

Verification inspections were conducted in collaboration with designers before crucial ceiling and wall closures. The project team prioritised accommodating client deliverables such as fibre and NBN connections and facilitated furniture, fixtures, and equipment deliveries. Shop drawing deliverables were fast-tracked for early review by designers.

The high-end finishes, specifically tailored for legal professionals, were a notable feature, along with effective management of a congested loading dock and goods lift, ensuring smooth coordination with base building and security protocols. The project faced significant time constraints, with a tight 10-week program, including 9 weeks on-site. To mitigate this challenge, the team engaged in early procurement of mechanical equipment, furniture, and AV systems. Working within a live environment added another layer of complexity, requiring careful planning and coordination to minimise disruptions.

A key emphasis was placed on sustainability, with a focus on environmental initiatives, such as carpet recycling through GreenChair – a sustainable furniture and goods repurposing program.

 

 

 

Related Projects

ALS Geochemistry’s New Australian Headquarters and Testing Facility

ALS Geochemistry
WA
New Build

Department of Finance, Parliament Place Fitout

024_P_R_ParliamentHouse2023_PhotographyByMattBiocich B
Department of Finance
WA
Fitout & Refurbishment

Thomson Geer Perth Office Fitout

thomson-greer-perth-shape-australia_1
Thomson Geer Lawyers
WA
Fitout & Refurbishment

KordaMentha Office Fitout

kordamentha-perth-office-fitout-shape-australia_1
KordaMentha
WA
Fitout & Refurbishment

Future Fund Aftercare

future-fund-aftercare-shape-australia_1
Future Fund
NSW
Aftercare

Undisclosed Perth Office Fitout

undisclosed-client-l4-1-william-st-perth-wa-shape-australia_1
Undisclosed
WA
Fitout & Refurbishment

Curtin University B314 Computer Lab Upgrade

b314_curtin_uni_shape_australia_perth_02
Curtin University
WA
Fitout & Refurbishment

Curtin University B405 Clinical Skills Lab Refurbishment Project

b405-curtin-uni-wa-shape-perth-australia_1
Curtin University
WA
Fitout & Refurbishment

Turner & Townsend Office Fitout

turner-&-townsend-office-fitout-perth-wa-shape-australia_1
Turner & Townsend
WA
Fitout & Refurbishment

Department of Communities Office Fitout

department-of-communities-perth-office-fitout-construction-wa-perth-shape-australia_7
Department of Finance
WA
Fitout & Refurbishment