121 Marcus Clarke St EOTF

The End of Trip Facilities for 121 Marcus Clarke St was delivered by SHAPE with an emphasis on creating a welcoming space for tenants.

Client:
Colliers International

Designer:
Capezio Copeland

Delivery Model:
Lump Sum

Location:
Canberra, ACT

Duration:
14 weeks

The End of Trip Facilities for 121 Marcus Clarke St was delivered by SHAPE with an emphasis on creating a welcoming space for tenants.

The pre-existing EOTF currently servicing the building was spaced across four basement levels; Basement 1 – Basement 4 and alternate between bike storage and staff amenities across the levels. The aim of the project was to provide a new purpose-built and contemporary EOTF, consolidated on one level. As the building remained occupied, the upgrade works needed to be undertaken sequentially.

The scope of works included the installation of new bike racks and a bike repair station, fit out of Female and Male bathrooms, including toilet partitions, showers, beauty bar, lockers, joinery, drying cupboards, ironing stations and steaming station. Trades included electrical, mechanical, plumbing, security, fire, painting, partitions and ceilings, joinery/lockers, end of trip facilities, toilet partitions, signage, and floor finishes, as well as new line marking throughout.

The B1 new works were undertaken first with the existing EOTF on B2-B4 remaining operational. Once the B1 works were complete and operational, the demolition and make good on B2-B4 commenced.  As the End of Trip Facilities was an occupied space, it was SHAPE’s top priority to ensure that disruption was kept to a minimum but delivery was at the highest quality.