Salisbury High School STEM
Client:
Salisbury High School
Designer:
Greenway Architects
Client PM:
DPTI
Delivery Model:
Guaranteed Maximum Price
Design and Construct
Location:
Salisbury North, SA
Duration:
30 weeks
Project Size:
1500 m2
Contract Value:
$1.9 million
The scope of works for this project included:
- Refurbishment and refit of four buildings including the external courtyard
- Classrooms, an outdoor learning space and teaching labs
- Teaching space for students with special needs and new offices
- Audiovisual and creative learning space
- Supply and installation of new mains and a fire hydrant upgrade
Ensuring safety throughout the upgrades was vital to the success of this project. Regular communication with the school and utilising the knowledge gained from recent experience on both STEM and education projects allowed us to maintain safety. We also initiated defects before the consultants produced their report, ensuring on-time completion of the project. Constant consultation with the client and stakeholders allowed us to find solutions with ease.
YOU MIGHT ALSO LIKE
06/04/22
To accommodate the state-wide shift of Year 7 students from primary school to high school, Golden Grove High School (GGHS) required a major infrastructure upgrade to accommodate the new students in 2022.
28/09/21
The aim of this project was to create modern, secure and comfortable boarding facilities with new open areas, collaborative spaces and common areas as well as upgraded bedrooms to enable students to have an individual, lockable space with their own services and free from distractions.
02/06/20
As part of Charles Darwin University, SHAPE was engaged to expand the student accommodation at the Casuarina Campus to offer both local and international students a residential community.
01/03/20
SHAPE experience in delivering PC1, PC2 and PC3 certified laboratories gave Curtin University confidence in our ability to deliver their new superlab.
04/10/19
UTS engaged SHAPE to deliver a new 6-floor shared office and learning space for their Graduate School of Health.
21/06/19
Flinders University in South Australia engaged SHAPE to upgrade their existing microscopy laboratory.
21/06/19
SHAPE was engaged to create the UniSA Business Hub with trading room facilities featuring state of the art equipment and finishes.
21/06/19
The City of Mitcham engaged SHAPE to undertake the Mitcham Memorial Library redevelopment project.
20/06/19
SHAPE was engaged by Swinburne University to complete stage 2 of their library refurbishment.
20/06/19
SHAPE was engaged by Swinburne University to complete the first stage of their library refurbishment.