New classrooms, zero disruption ready for Term 1 - Pinnacle College
A modular solution delivered in five months to meet Pinnacle College’s expanding enrolments, installed over the school holidays with zero disruption to term time.
Planning your school build for the start of the 2027 school year?
Client: Pinnacle Collage
Delivery Model: Lump Sum
Location: Elizabeth East, SA
Duration: 14 weeks
Number of Modules: 6
Project Size: 215m2
Enquiry to Term 1 ready
Onsite install, over school holidays
Additional student capacity
Three new classrooms, plus two staff offices
Growing enrolments and a tight deadline?
Faced with growing enrolments for the 2026 school year, Pinnacle College needed a fast, efficient solution to increase capacity at its Elizabeth East Campus.
Our Modular by SHAPE team delivered the new facility within five months of the initial enquiry, ensuring it was ready for students and teachers at the start of Term 1 2026.
The new building includes three classrooms, increasing Pinnacle College’s capacity by more than 28 students. It also incorporates two staff offices, a covered veranda and walkway, creating practical, connected spaces for both learning and staff support.
Running out of space? Add new classrooms in months.
Complete modular solutions. Planning, design, manufacture and delivery, one team from start to finish.
Installed over the school holidays
The six modular units were installed onsite in just two and a half weeks over the school holidays. This approach enabled Pinnacle College to add much-needed facilities while minimising disruption to the live school environment.
The modules were installed on dry-laid footing blocks within the existing car park, connected and secured with tie-downs, and linked to the existing raised walkway via a lightweight deck bridge.
One team from planning through to handover
Our end-to-end modular construction approach provided Pinnacle College with one integrated team managing the full project journey. We managed planning and approvals, including associated fees, as well as design, manufacture, procurement, onsite installation and handover.
By bringing these stages together under one roof, we could streamline decisions, reduce complexity and provide greater programme certainty from the outset. The result was a high-quality, purpose-built facility delivered efficiently and ready when the school needed it most.