Client:
APA Group
Designer:
Siren Design
Delivery Model:
Construction Management
Location:
Sydney, NSW
Duration:
19 weeks
Project Size:
2,016 m2
The design brief was to create a safe, comfortable, sustainable working environment optimising the use of space to enhance the existing work culture; creating a flexible fitout that would offer increased amenities for employees was key. Construction works consisted of new interconnecting stairs being built between level 24 and level 25, and a wide variety of works on each floor.
Our team worked closely with Siren Design and APA to find alternative design solutions that would ensure the fitout stayed within budget without compromising the quality. This led to Perfect Delivery and a fantastic project outcome.